Solar installation in Zimbabwe

Solar Systems From $137 per month

Fully installed systems from Solarpro. Prices include panels, inverter, batteries & professional installation. Get yours today

Limited-Time Offer Special discounts on all packages until September 2025 +263 718 924 393

How Rent-to-Buy Works

  1. Choose a package and complete quick KYC.
  2. Pay a 30–50% deposit and pick a term (3–12 months).
  3. We install, commission, and you own it fully after paying all your installments.
  4. Pay monthly rentals; everyone is welcome to apply, including those living outside Zimbabwe
Interest examples on this page are illustrative; final terms confirmed on approval.

Solar Packages & Pricing

Installed price shown. Click “Details” for full specs, RTB example, and warranties.

{{ pkg.badge }}

{{ pkg.name }}

{{ pkg.desc }}

{{ formatUSD(pkg.price) }}
Or {{ formatUSD(rtbMonthly(pkg)) }}/mo for {{ rtb.termMonths }} months*

*Illustrative RTB example: deposit {{ pkg.depositPercent }}%, no interest. Final terms subject to approval.

{{ p }}

Technical Specifications

Inverter {{ pkg.inverter }}
Panels {{ pkg.panelString }}
Total PV (kWp) {{ pkg.totalKwp }}
Battery (nominal) {{ pkg.batteryNominal }}
Battery (usable ~) {{ pkg.usableKwh }} kWh
Monitoring {{ pkg.monitoring }}
Surge Rating {{ pkg.surge || '—' }}
Warranties {{ pkg.warrantyNote }}

Rent-to-Buy Example (Illustrative)

{{ rtb.depositPercent }}%
{{ rtb.termMonths }} months
Estimated Monthly
{{ formatUSD(rtbMonthly(pkg)) }}
Cash Price: {{ formatUSD(pkg.price) }}
Deposit: {{ formatUSD(rtbDeposit(pkg)) }}
Rental Amount: {{ formatUSD(rtbBalance(pkg)) }}
Total Rental Fee: {{ formatUSD(rtbTotal(pkg)) }}

Maximum rental period is 12 months. Final rental terms will be confirmed on approval.

Included

  • {{ i }}

Excluded

  • Extra trenching/cabling beyond standard
  • Special mounting/roof works if required
  • ZESA meter change & net metering fees
WhatsApp Quote

Installed Price — What’s Included

  • Panels, inverter, batteries as specified
  • DB integration, DC/AC breakers, isolators, surge protection
  • Standard roof mounting (tile/IBR up to 25m cabling)
  • Commissioning, monitoring app setup, handover
  • Workmanship warranty (12 months)

Exclusions (if needed, quoted separately)

  • Trenching / cabling beyond 25m
  • Roof reinforcement / special mounting
  • ZESA meter change & net metering fees
  • Generator integration beyond standard ATS

Warranties & After-Sales Support

Component Warranty Notes
Inverters 1–10 years (brand-specific) SRNE/Growatt 1yr; Sunsynk/Sigenergy/Hyxi up to 10yrs
Batteries 5–10 years Usable kWh noted per package
Panels 10–12 years product; 25 years performance Tier-1 brands
Workmanship 12 months Includes commissioning & app setup

SLA: remote response within 24h; on-site within 72h (business days).

Net Metering — How It Works

  1. Eligibility check & application forms
  2. Technical inspection & meter change (ZESA)
  3. Commissioning & export enablement
  4. Monthly bill shows imports/exports; savings vary by usage

Timelines & fees are set by ZESA and may vary by area.

Recent Solarpro Installations

Homes, businesses & farms across Zimbabwe.

Marlbrough cluster home solar

Marlbrough Cluster Home

3kVA hybrid — fridge, TV, lights. ~80% bill reduction.

La Rochelle Hotel solar

La Rochelle Hotel

25kW Sigenergy — full guest services backup.

Chihota homestead solar

Chihota Rural Homestead

5kVA hybrid — runs home & borehole pump.

Ready to Go Solar?

Lock in savings and reliable power with a team you can reach on WhatsApp.

Frequently Asked Questions

What’s included in the installed price?
Panels, inverter, batteries (as specified), DB integration, protections, standard mounting, commissioning, and app setup.
Can I settle early?
Yes. You can settle early; we’ll confirm the payout on request.
Do you assist with ZESA Net Metering?
We guide you through forms, meter changes, and commissioning timelines.
What warranties do I get?
Inverters 1–10y (brand-specific), batteries 5–10y, panels 10–12y product / 25y performance, workmanship 12 months.
How long does installation take?
Most residential installs complete within 1–3 days after deposit and scheduling.
What payment methods do you accept?
Visa/Mastercard, cash, and bank transfer.

Flexible Payment Options

Visa, Mastercard, cash, and bank transfer accepted.

Visa
Mastercard
Cash
Bank Transfer